Energy Savings for Optimized Chiller Plant after HVAC Upgrades

Armstrong Fluid Technology
The One Waterfront Tower chiller plant optimization project qualified for a $83,568 custom utility rebate and will save an estimated 624,000 kWh or $170,000 annually.

Energy Savings for Optimized Chiller Plant after HVAC Upgrades

The One Waterfront Tower chiller plant optimization project qualified for a $83,568 custom utility rebate and will save an estimated 624,000 kWh or $170,000 annually.

Completed in 1990, One Waterfront Towers stands out on the waterfront skyline of Honolulu, showcasing the beauty and sophistication originally conceived by Design Architect Boone & Boone. Although the towers and condominium units are spacious and beautifully designed, the HVAC system was less efficient than originally anticipated, and often struggled to maintain comfortable indoor temperatures.

With local utility rates at $.24 per kWh plus additional demand charges, finding a way to reduce energy consumption has been paramount for the One Waterfront Tower property management group and the building residents. At the time Karl Fujii of Hawaiian Building Maintenance (HBM) approached One Waterfront Tower management with a proposal for chiller plant optimization, the plant was operating at an annualized average of a 1.9 kW/Ton.

To transform the existing, inefficient chiller plant into an optimized, demand-based plant, Armstrong Fluid Technology recommended variable speed primary pumping, variable speed chillers, variable speed condenser water pumps and variable speed cooling tower fans.

Design Envelope 4300 pumps from Armstrong Fluid Technology

Design Envelope 4300 pumps

Having tried other strategies for improving efficiency, management at One Waterfront Towers agreed to optimize their chilled water air conditioning plant. HBM was engaged to install flow meters, variable frequency drives for the cooling tower fans, two-way control valves on terminal units, and a bypass control valve along with the Armstrong Integrated Plant Control (IPC) demand based control system. The IPC automated control system uses patented technology to monitor and operate the chiller plant in the most energy-efficient manner possible.

It was amazing to watch the consumption graph go down once the IPC unit was switched into full auto,” explains John Horvath, General Manager of One Waterfront Tower. “More importantly, the residents could feel the cooler air moving through the towers almost immediately.

Design Envelope 11550 Integrated Plant Control System from Armstrong Fluid Technology

Design Envelope 11550 Integrated Plant Control System

The IPC system provides touchscreen control with a user-friendly icon driven system schematic and downloadable data log. The control screens are also accessible via web interface, for easy remote access. Ease of use and monitoring ability were important to the One Waterfront Tower facility management team and also for the local utility that contributed energy efficiency rebate funding for the retrofit.

The plant automation system is now geared for optimal operation of an all-variable speed plant configuration. The optimization logic seamlessly trades off capacity between all of the HVAC components to maintain the highest efficiency of the entire cooling system. On the strength of the upgraded equipment, the new control technology, and the optimization support & service from HBM, the plant now operates at an annualized average of less than .09 Kw/ton and will save an estimated 624,000 kWh or $170,000 annually.

The new chiller plant design and all-variable speed IPC 11550 plant automation system has benefited One Waterfront Tower by helping them reduce electrical consumption, lower maintenance costs, and support existing initiatives for sustainable operation.

Hawaii Energy presented a check for $83,568 to One Waterfront Towers, recognizing their investment in energy efficient cooling equipment as well as their commitment to sustainable operating practices.

Efficiency Matters
A decline in efficiency of 5% in a 1000-ton chilled water plant can increase annual operating costs by $10,000 or more; therefore, it is important to focus on opportunities to improve efficiency as a significant amount of energy and money can be saved. To improve and maintain chilled water plant performance and energy efficiency, consider using ECO*Pulse™ HVAC Health Management; or Request an Energy Audit to learn where energy savings can be found in your building.

Related Articles

Related Whitepapers

Expansion Joint Expertise Improves Industrial Wastewater System Reliability

The majority of industries have wastewater treatment plants. Government agencies and local governments require these facilities to meet pretreatment requirements. Pretreatment rules were enacted to prevent…

How to Decrease Oil Changes with Bearing Isolators [Inforgraphic]

Learning how to decrease oil changes can be time- and money-saving. Oil life can be long if contamination is eliminated, which is easier said than…

Synchronous Machines Are The Optimal Choice For Heavy Industry

TECO-Westinghouse experience assures superior performance and reliability For over a century, Westinghouse has been the pacesetter in the design and production of electric machines for heavy…

Why FLEXXORs Are Designed Differently

J. Hilbert Anderson, President of Coupling Corporation of America, discusses some of the reasons why FLEXXORs are designed differently from all other flexible couplings, and…

Comments

One response to “Energy Savings for Optimized Chiller Plant after HVAC Upgrades”

  1. I agree. Keeping your AC system maintained ensures that it will run efficiently. The main benefit of this is that it will perform better and not need to consume more energy than it has to. When your AC system is not maintained properly, it will not operate optimally. The more efficient your system is, the less your energy bills are going to be.

Leave a Reply

Your email address will not be published. Required fields are marked *

Join the #PumpTalk Community


By submitting this form, you are consenting to receive marketing emails from: Empowering Pumps & Equipment, 2205-C 7th Street, Tuscaloosa, AL, 35401, http://www.empoweringpumps.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact