Overview

Due to the alarming increase in population and rapid industrialization in Pakistan, the drinking water has greatly deteriorated. Not only is the water contaminated with pathogenic microorganisms and often dangerous for consumption, it contains extreme total dissolved solids (TDS) and high salts. This makes for highly corrosive conditions when water comes in contact with industrial machinery.

In an effort to test whether or not Magnation’s technologies would be able to better conditions for manufacturing organizations within Pakistan, Naveena (a producer of denim products) chose to test it on a two-ton capacity boiler. This was an ideal test because the boiler is a closed-looped system, where water is recirculated and not impacted by other outside factors.

The main focus of the study was to see if Magnation could reduce Naveena’s “Blowdown Time,” which requires the maintenance staff to shut down operations and clean out any scale or debris caused by the harsh water.

Problem

Naveena has historically been forced to stop production at least 12 times per day (in a 24 hour period) for Blow Down Time. This has been both extremely costly during downtime. Additionally, the process reduces efficiency and takes away from other initiatives that could prove beneficial to the success of Naveena’s manufacturing processes.

Solution

The Magnation Rainbolt SS 2 was installed in an effort to reduce the TDS and soften the water. The Rainbolt has a 2-inch pipe diameter, has a stainless steel 316 body, and can be installed inline post-pump.

It is used to make water softer and more soluble, which significantly decreases the amount of scale and buildup in the manufacturing process. By using the Magnation Rainbolt SS 2 on Naveena’s 12-ton boiler capacity, the goal was to significantly reduce blowdowns and increase condensate water recovery, saving Naveena both time and money.

Results

Tangible results were seen very soon in the testing process. First and foremost, recovery condensate water increased from 974 m3 to 1129 m3 — this translates to a 7.4 percent increase in efficiency.

Secondly, the number of blowdowns decreased from twelve (12) to five (5) per 24-hours, which means more than 58 percent blowdown costs saved.

At the time of testing, both before and after the Magnation unit was installed, the Reverse Osmosis system was malfunctioning and is excluded as a factor in the results.

Magnation Rainbolt Case study chartConclusion

The Magnation Rainbolt SS2 is an ideal investment for manufacturers in areas throughout the world where water conditions are harsh. With Naveena as a prime example, this case study reveals that Magnation technologies have the power to: (1) increase machinery efficiency, (2) significantly reduce scaling and downtime, (3) increase the life of boilers, pipes, and other machinery impacted by poor water conditions. Naveena claimed “a payback time of less than three months on the investment.”

Read more about the Rainbolt™ from Magnation!

Related Articles

Related Whitepapers

Expansion Joint Expertise Improves Industrial Wastewater System Reliability

The majority of industries have wastewater treatment plants. Government agencies and local governments require these facilities to meet pretreatment requirements. Pretreatment rules were enacted to prevent…

How to Decrease Oil Changes with Bearing Isolators [Inforgraphic]

Learning how to decrease oil changes can be time- and money-saving. Oil life can be long if contamination is eliminated, which is easier said than…

Synchronous Machines Are The Optimal Choice For Heavy Industry

TECO-Westinghouse experience assures superior performance and reliability For over a century, Westinghouse has been the pacesetter in the design and production of electric machines for heavy…

Why FLEXXORs Are Designed Differently

J. Hilbert Anderson, President of Coupling Corporation of America, discusses some of the reasons why FLEXXORs are designed differently from all other flexible couplings, and…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Join the #PumpTalk Community


By submitting this form, you are consenting to receive marketing emails from: Empowering Pumps & Equipment, 2205-C 7th Street, Tuscaloosa, AL, 35401, http://www.empoweringpumps.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact