Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

New Power Plant Pumps: Maximizing Uptime & Reliability 3-Part Webinar Series – Feb. 20th, 27th, Mar. 6th

Industry News

New Power Plant Pumps: Maximizing Uptime & Reliability 3-Part Webinar Series – Feb. 20th, 27th, Mar. 6th

Join us on February 20, 2014 for the Hydraulic Institute’s latest Pump Training Event.

This new Power Plant webinar series provides a concise overview of how proper pump selection and operation for combined-cycle power plants are crucial for minimizing energy consumption and increasing overall plant efficiency, reliability, and profitability. This educational program is a “must-attend” for engineers and plant operators as it provides a better understanding of how pump selection can affect the overall systems design and reliability for power plants.

Increasing energy demands require improved design and operation to achieve greater efficiencies in today’s power generation facilities. In this series you will gain expertise on proper pump selection and ways to improve operations for any combined-cycle plant. This in-depth series will show a step-by-step process on how to minimize your energy consumption, which will increase your overall plant efficiency, reliability and profitability.

Registration is now open: http://estore.pumps.org/Power-Plant-Pumps—Maximize-your-Uptime-Reliability-3-Part-Webinar-Series-EP-P262C0.aspx

Session 1: General Power Industry Overview for Pump Applications & Operations
February 20, 2014, 1:00 – 2:00pm EST

Session 2: Reviewing Power Plant Configurations & Combined-Cycle Plants (400 MW)
February 27, 2014, 1:00 – 2:00pm EST

Session 3: Gain Knowledge in Specific Processes & Pump Selections
March 6, 2014, 1:00 – 2:00pm EST

Quick Webinar Series Details:

Session Dates: February 20, February 27, and March 6, 2014
Session Time: 1:00-2:00pm EST (all sessions)
Series Registration: $249.00
Presenter: Bill Livoti, Business Development Manager Power Generation, WEG Electric Corporation
Session Coordinator: For registration questions, please contact Lori Siegfried, Marketing & Events Coordinator, Hydraulic Institute at 973.267.9700 x112 or lsiegfried@Pumps.org

Registration Link: http://estore.pumps.org/Power-Plant-Pumps—Maximize-your-Uptime-Reliability-3-Part-Webinar-Series-EP-P262C0.aspx

For more information about the upcoming webinar series, visit www.PumpSystemsMatter.org or call Mark Sullivan, Director, Education & Marketing at 973.267.9700 x200 or msullivan@Pumps.org.

Related Articles

Related Whitepapers

Expansion Joint Expertise Improves Industrial Wastewater System Reliability

The majority of industries have wastewater treatment plants. Government agencies and local governments require these facilities to meet pretreatment requirements. Pretreatment rules were enacted to prevent…

How to Decrease Oil Changes with Bearing Isolators [Inforgraphic]

Learning how to decrease oil changes can be time- and money-saving. Oil life can be long if contamination is eliminated, which is easier said than…

Synchronous Machines Are The Optimal Choice For Heavy Industry

TECO-Westinghouse experience assures superior performance and reliability For over a century, Westinghouse has been the pacesetter in the design and production of electric machines for heavy…

Why FLEXXORs Are Designed Differently

J. Hilbert Anderson, President of Coupling Corporation of America, discusses some of the reasons why FLEXXORs are designed differently from all other flexible couplings, and…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Join the #PumpTalk Community


By submitting this form, you are consenting to receive marketing emails from: Empowering Pumps & Equipment, 2205-C 7th Street, Tuscaloosa, AL, 35401, http://www.empoweringpumps.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact