Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Shredder Pumps Installed at Historic Ellis Island

BJM Pumps
Image of Ellis Island

Shredder Pumps Installed at Historic Ellis Island

The Facility

Ellis Island, in the shadow of the Statue of Liberty, is one of America’s most popular historic sites. The island is one of a number of small, naturally occurring islands in New York inside Ellis IslandHarbor. Over many years, this island — which for millions of people represented the gateway to the New World — was enlarged from its original 3.3 acres to its current 27.5 acres by adding landfill from ships ballast and possibly excess earth from the construction of the New York City subway system.

The island was not always a point of entry for immigrants or a tourist destination. By the time it was purchased in the 1770s by Samuel Ellis, it had served as a hanging site for pirates, a harbor fort, and an ammunition and ordinance depot. The US Government purchased the island from New York State in 1808. Just before the War of 1812 broke out a series of structures were erected that served as a defense system for New York Harbor. Ellis Island was approved as a site for fortifications and on it was constructed a parapet of three tiers of circular guns.

In January 1892 Ellis Island was opened as an immigration station. Over the next 62 years more than 12 million immigrants were processed at the site. After World War I immigrants applied for visas at American consulates in their country of origin, and the only immigrants passing through Ellis Island were those who had problems with their paperwork, war refugees and displaced people. Ellis Island was officially closed as an immigration station in 1954.

In 1965 President Lyndon Johnson declared Ellis Island part of the Statue of Liberty National Monument, and in 1984 Ellis Island underwent a major restoration—the largest historic restoration in U.S. history. In recent years the island has become one of the most popular tourist destinations in the National Park Service. That means a lot of visitors and the need for well working infrastructure.

On October 28, 2012, Hurricane Sandy swept over Ellis Island, Liberty Island, and much of the East Coast. The Ellis Island Immigration Museum reopened on a limited basis one year later, but repairs to the buildings and infrastructure would continue for many months.

The Challenge

Although the damage to Ellis Island was extensive, the island’s antiquated sewage system was fraught with problems long before Hurricane Sandy came ashore. New Jersey-based Pump Express Services had been providing maintenance to the island’s sewage ejector system for a couple of years before Sandy hit.

According to Pump Express sales manager Fred Hettinger, in the two years before Sandy they were called to the island numerous times in response to high water alarms, clogging and ultimately a failed pump. “They had a two-pump system and when one pump failed they let the system run on the other,” Hettinger said. Then, the second pump failed “and they had nothing.”

Hettinger explained that a significant problem was that the old pumps were a simple ejector type and didn’t break down solids. But along with the sewage flow on the island there was also a significant amount of debris—with synthetic fibers being particularly problematic—that routinely clogged the system.

Left with only minimal sewage disposal, and faced with a grand reopening to the public targeted for July 4th, 2013, the island’s maintenance engineers reached out again to Pump Express Services—this time for a more permanent solution.

The Solution

“We submitted a proposal to replace the old pump system with a pair of 15 SK150 Pumphorsepower BJM shredders,” Hettinger said. “We’ve been using BJM shredders for four or five years now and everything we’ve been able to throw at them they’ve been able to handle.”

In April 2013 Pump Express installed a pair of 900-pound SK Series shredder pumps into the revamped Ellis Island system. The pumps can handle 845 gpm of wastewater at heads of up to 94 feet.

The SK Series pumps were chosen specifically because they are designed to shred solids before passing the liquid. The shredder pumps leave solids slightly larger than if they were passed through a grinder pump. The shredding action is produced through use of a unique FangTM non-clog cutting impeller with tungsten carbide vane tips against a high-chrome “tooth shaped” diffuser plate. The cutting tips shred solids against the pump suction plate, continuously ripping the solids apart with 360o shredding action. The SK Series shredder pump works on many objects that would clog an ordinary pump.

Other quality features built into the SK Series pumps that supported their recommendation for the Ellis Island installation include the following.

  • The 304 stainless steel motor housing helps protect the pumps from abrasion and premature wear caused by the harsh saltwater environment.
  • The motor is protected by double mechanical seals. The lower seal is made of silicon carbide/silicon carbide and the upper seal is made of carbon/ceramic. In addition, a lip seal has been installed above the impeller that helps prevent abrasives, such as sand, from entering the seal chamber.
  • Winding protection and NEMA Class F motor insulation allow the motor temperature to rise to 230oF. An automatic switch turns the pump motor off if the temperature and/or amp draw gets too high. When the motor cools the switch will automatically reset and the pump will restart.
  • A hardened cast iron exterior stands up to rough handling and pumping of sandy water unlike pumps with soft resin impellers or plastic exterior components.

(Specifications may differ between models.)

The Conclusion

About six months after installation a team from Pump Express went back to Ellis Island to make sure the new pumps were performing as anticipated. “We’re now going on a year and a half and haven’t had any issues,” Hettinger said. That’s a vast improvement over the previous average of a visit every six months. “I bet in the last 18 months if we had had to go out there three more times it would have cost them half of what the upgrade cost them,” he added.

Related Articles

Related Whitepapers

Expansion Joint Expertise Improves Industrial Wastewater System Reliability

The majority of industries have wastewater treatment plants. Government agencies and local governments require these facilities to meet pretreatment requirements. Pretreatment rules were enacted to prevent…

How to Decrease Oil Changes with Bearing Isolators [Inforgraphic]

Learning how to decrease oil changes can be time- and money-saving. Oil life can be long if contamination is eliminated, which is easier said than…

Synchronous Machines Are The Optimal Choice For Heavy Industry

TECO-Westinghouse experience assures superior performance and reliability For over a century, Westinghouse has been the pacesetter in the design and production of electric machines for heavy…

Why FLEXXORs Are Designed Differently

J. Hilbert Anderson, President of Coupling Corporation of America, discusses some of the reasons why FLEXXORs are designed differently from all other flexible couplings, and…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Join the #PumpTalk Community


By submitting this form, you are consenting to receive marketing emails from: Empowering Pumps & Equipment, 2205-C 7th Street, Tuscaloosa, AL, 35401, http://www.empoweringpumps.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact