Optimizing turbine repair resources

By: Sulzer

Sulzer cuts maintenance project costs by 25% with complete driveline overhaul

Steam turbines are used in many applications on various scales to drive equipment such as pumps, compressors and generators. Periodic, preventive maintenance is crucial to ensuring reliable and efficient operation. For a power generation site in France, a major outage was made more cost-effective and easier to manage by using Sulzer to deliver a major overhaul on the turbine as well as the gearbox and pump connected to it.

Routine maintenance, as laid out by the original equipment manufacturer (OEM) is essential for the continued reliability of machinery. In the case of steam turbines, major overhauls are required every five to eight years and the process needs to be carried out by a skilled team of engineers. Very often, the rest of the drivetrain is included in the project, which can see each piece of equipment serviced by maintenance technicians from different companies working in the same location.

Holistically engineering the complete powertrain

For one power generation site in France, a recent major overhaul of a steam turbine was made far less complicated, and more cost-effective, by sourcing the necessary expertise from a single supplier. Sulzer was awarded the contract to refurbish the steam turbine, the gearbox and the pump it was driving. The whole project needed to be completed within the six-week window of a planned outage.

Sulzer has a long-standing relationship with the power plant, being involved with the pumps at the facility for many years. Ahead of the scheduled outage, the site’s maintenance manager asked if the pump maintenance could be combined with the project to overhaul the steam turbine. This proposal had the potential to reduce the number of operatives working in the area and simplify project management.

Three into one project management

As an independent specialist in rotating equipment, Sulzer agreed to deliver the project, starting with the 10 MW steam turbine.

Maxime Gheux, Buchelay Service Center Manager at Sulzer, explains: “We offered a number of benefits to the customer, not least a simplification of project management. In the past, a similar outage would have seen three separate companies involved in the project, one each for the turbine, gearbox and pump. By taking on the combined project, Sulzer was able to offer cost savings as well as just one point of contact for the repairs.”

Following the first drivetrain overhaul, the customer expressed complete satisfaction in the way the project was delivered, Sulzer has been contracted to complete two more similar projects. Together with the company’s proven track record of delivering rotating equipment revamp projects, the fact that Sulzer’s bid just for the turbine overhaul was 25% less than the OEM, made this an easy decision for the operator.

Sulzer Optimizing turbine repair resources (1)

Sulzer was awarded the contract to refurbish the steam turbine, the gearbox and the pump it was driving, to be completed withing the six-week window

Bespoke tools that defy maintenance challenges

As part of the continuing partnership with the power plant, Sulzer has been creating special tools to simplify and speed up various tasks. One example is the tool to check the shaft clearance, which has been developed since the first project, and will be used along with equipment for vertically stacking the diaphragms, saving space in this congested area.

Maxime continues: “The customer is keen for us to develop more tools, especially to support the non-destructive testing (NDT) of the diaphragms and improve the handling of these components. We have considerable expertise in our global network of service centers and that can be used to benefit all of our customers.”

An independent service to OEM standards

Thanks to the projects completed so far for the power plant, as well as ongoing work, Sulzer should soon receive the same qualification as an OEM. This means Sulzer would be able to complete repairs using its own facilities, documents and expertise.

Maxime concludes: “Our knowledge of rotating equipment and our engineering expertise means that we can effectively deliver these combined projects. The field service teams work closely with our engineering departments to ensure all the necessary planning is in place to deliver a successful overhaul. Our combined skill offers power plant operators the opportunity to simplify outage management and make the project more cost effective.”

About Sulzer:
Sulzer is a global leader in fluid engineering. We specialize in pumping, agitation, mixing, separation and application technologies for fluids of all types. Our customers benefit from our commitment to innovation, performance and quality and from our responsive network of 180 world-class production facilities and service centers across the globe. Sulzer has been headquartered in Winterthur, Switzerland, since 1834. In 2021, our 13’800 employees delivered revenues of CHF 3.2 billion. Our shares are traded on the SIX Swiss Exchange (SIX: SUN).

www.sulzer.com

Related Articles

Sulzer Tackling rising energy costs wastewater treatment plant

Tackling rising energy costs

Nine tips for reducing wastewater treatment plant energy use Within the water treatment industry, aeration processes consume the most energy. However,…

Related Whitepapers

Expansion Joint Expertise Improves Industrial Wastewater System Reliability

The majority of industries have wastewater treatment plants. Government agencies and local governments require these facilities to meet pretreatment requirements. Pretreatment rules were enacted to prevent…

How to Decrease Oil Changes with Bearing Isolators [Inforgraphic]

Learning how to decrease oil changes can be time- and money-saving. Oil life can be long if contamination is eliminated, which is easier said than…

Synchronous Machines Are The Optimal Choice For Heavy Industry

TECO-Westinghouse experience assures superior performance and reliability For over a century, Westinghouse has been the pacesetter in the design and production of electric machines for heavy…

Why FLEXXORs Are Designed Differently

J. Hilbert Anderson, President of Coupling Corporation of America, discusses some of the reasons why FLEXXORs are designed differently from all other flexible couplings, and…

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Join the #PumpTalk Community


By submitting this form, you are consenting to receive marketing emails from: Empowering Pumps & Equipment, 2205-C 7th Street, Tuscaloosa, AL, 35401, http://www.empoweringpumps.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact